VINIVEL Ltd. has concluded ADMINISTRATIVE AGREEMENT No. BG06RDNP001-4.014-0071 -C01/10.10.2023 for the provision of non-repayable financial assistance under the Rural Development Program for the period 2014-2020 under Procedure BG06RDNP001-4.014 for the selection of project proposals with an investment value of up to EUR 300,000 under sub-measure 4.2. “Investments in the processing/marketing of agricultural products” under Measure 4 “Investments in tangible assets”
*** Translated with www.DeepL.com/Translator (free version) ***
PROJECT NAME: Construction of a photovoltaic power plant with a total peak capacity of 170 kWp for the own needs of a wine production company – YAMANTIEVI Winery. The photovoltaic power plant is installed on the roofs of the winery located in the town of Ivaylovgrad, Ivaylovgrad municipality, Haskovo region, and is used to generate electricity for its own consumption. The project aims to improve the overall activity of the YAMANTIYEVI winery, owned by VINIVEL Ltd., through better use of production processing factors. The investment supported by the project is the construction of a photovoltaic power plant for own use, and the goal is to achieve energy independence and efficiency for the enterprise, while providing the opportunity to produce wine using the most modern technologies that ensure its high quality.
The project supported under sub-measure 4.2 “Investments in the processing/marketing of agricultural products” of measure 4 “Investments in physical assets” of the Rural Development Program for the period 2014-2020 contributes to the implementation of Priority 5 “Promoting the efficient use of resources and supporting the transition to a low-carbon and climate-resilient economy in agriculture, the food sector, and forestry.”
*** Translated with www.DeepL.com/Translator (free version) ***
Area with emphasis 5B “Improving energy efficiency in agriculture and the food industry.”
Area with emphasis 5B “Facilitating the supply and use of renewable energy sources, by-products, waste and residues, and other non-food raw materials for the bioeconomy”;
Objectives:
The implementation of the project has achieved the objectives of Sub-measure 4.2. “Investments in processing/marketing of agricultural products” under Measure 4 “Investments in physical assets” of the RDP 2014-2020, improving the overall activity, economic efficiency, and competitiveness of the wine production enterprise through:
1. better use of production factors;
2. improving environmental protection.
Results:
As a result of the project implementation, a significant environmental effect was achieved by stimulating wine production in the country and investments related to improving energy efficiency within enterprises, reducing harmful emissions through the use of technologies for the production of energy from renewable energy sources.
The overall performance of the company has been improved through:
– – Reduction of the cost price of the products manufactured by the company
– – Environmental protection, including reduction of harmful emissions
– -Подобряване на енергийната ефективност в предприятието, чрез използване на енергия от ВЕИ за собствено потребление